SOME OF THE PROJECTS ICL HAS UNDERTAKEN

Commissioned by the AGD (Accountant General Department) to carry out a comprehensive health check on all mission critical equipment for IFMIS. This included over 22 high capacity servers, storage area network, switches and power equipment at both the production and disaster recovery sites.

Local Area Network Installation at University of Malawi Chancellor College.

IDU Budget Software installation at Electricity Supply corporation of Malawi (Escom)

Syspro ERP Installation at Malawi College of Accountancy, Soche Technical College, Nasawa Technical College, Lilongwe Technical college and Salima Technical College.

Installation of 160KVA and 120KVA Uninterruptible Power Supply(UPS) at Accountant General Department of Human Resources and Management Training.

Maintenance of Traffic Counters on behalf of Road Administration Nsanje to Karonga

Fujitsu Hyper V High Availability Installation and Configuration at Kelfoods

Installation of E-Grannery Library System at Mzuzu University